November 3, 2013
Here you can see the “inscription wall” on the right, and the block in the foreground is for the wall at the flagpoles.
All of the walls are now up. You can see here that they are being prepped for the stone.
The plumber/electrician (Bill Sweet) was here and looked over the job and what he needed. He will be getting with John and coordinating with him.